As a small, independent school, we are not a ‘big fish’ client, but these two ladies have certainly made us feel like their number one priority… I am forever grateful to Joe Keough for recommending IMPACT and keeping my sanity intact.
I cannot thank you both enough for all the attention and care you have both put into our projects at Heritage. I am a big proponent of ‘the little things matter’ and you both are such experts in that area.
KRISTIN SKELLY
Head of School, The Heritage School
The Heritage School
Upper School Expansion
The Heritage School is expanding its current operations to include an Upper School building that will house 9th – 12th-grade students. The 11,600-square-foot building will consist of counseling areas, conference rooms, and 10 additional classrooms. In addition, the existing school driveway will be extended to provide a safe route for students to be dropped off close to the building with a covered walkway.
Project Details:
Location:
Newnan, GA
Services:
Development Management
Size:
11,600 SF
Completion:
2024
Client/Owner:
The Heritage School
Design Team:
DM Carithers
Contractor:
RaLin Construction
Innovation Center
Built in 1979, The Heritage School’s current Middle School building is the desired location for their new Innovation Center. This building will house physics, biology, maker space/robotics, drafting/design/computer science, and a lower school lab. Under a design-build contract, the existing building will undergo a significant interior renovation and feature a renovated courtyard.
Project Details:
Location:
Newnan, GA
Services:
Development Management
Size:
6,000 SF
Completion:
2025
Client/Owner:
The Heritage School
Design Team:
MSSA-PBK
Contractor:
Tomco Construction