Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Quis ipsum suspendisse ultrices gravida. Risus commodo viverra maecenas accumsan lacus vel facilisis.

ZOE CALATRAVA

Menager in ABC Co.

Abraham Baldwin Agricultural College

Agricultural Facilities Enhancement

This project includes 28,000 GSF of new construction and renovation of the 22,215 GSF Chambliss Hall, originally built in 1971.  Chambliss Hall will include enhanced specialized labs to support smaller-scale equipment and materials involved in agriculture, technology, forestry, and agricultural education programs. 

The project also includes associated infrastructure necessary to develop the proposed site, which is outside the perimeter of existing campus development.

Project Details:

Location:

Tifton, GA

Services:

Program Management

Size:

28,000 SF

Completion:

2023

Green Building:

Georgia Peach

Client/Owner:

ABAC, University System of Georgia BOR

Design Team:

Praxis 3

Contractor:

JCI Contractors